Assembly for sterilizing and depyrogenating containers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10925982
APP PUB NO 20190060493A1
SERIAL NO

16076927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly for sterilizing and depyrogenating containers includes a feeding station, a heating station, and a cooling station. The stations are passed through by a conveyor of containers. The cooling station includes a main unit coupled without discontinuities to the heating station and at least one interchangeable air treatment module. The main unit includes at least one inlet aperture connected without interruptions to an air diffuser arranged above at least a portion of the conveyor, and at least one outlet port. Each module has at least one supply hose with shape and dimensions complementary to those of the at least one inlet aperture in order to be detachably coupled thereto, and at least one suction channel with shape and dimensions complementary to those of the at least one outlet port in order to be detachably coupled thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
I M A INDUSTRIA MACCHINE AUTOMATICHE S P A IN SIGLA IMA S P AITALY - DEL EMILIA AUZANNEAU OZZANO DELL EMILIA BOLOGNA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meoni, Eddi Ozzano Dell'Emilia, IT 6 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00