Air-collecting structure for enhancing cooling performance for transition piece and gas turbine combustor having same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10837296
APP PUB NO 20190071985A1
SERIAL NO

16026021

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air-collecting structure effectively cools a transition piece of a duct assembly in a gas turbine combustor. The structure includes a flow sleeve having a plurality of cooling holes and surrounding the transition piece, the cooling holes formed in a lateral side of the flow sleeve to receive a compressed cooling air and arranged in rows running parallel to each other in a longitudinal direction of the flow sleeve, the rows progressing up the lateral side from a lower row to a higher row; and a plurality of scoops arranged in correspondence with predetermined cooling holes among the plurality of cooling holes and configured to collect an amount of air according to row. Each scoop includes an inlet having a predetermined radius for collecting the compressed cooling air. The radius is constant for the scoops of any one row and increases from the lower row to the higher row.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTDSEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Sung Wan Busan, KR 101 1289

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00