Electrochemical reaction device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10883180
APP PUB NO 20190085470A1
SERIAL NO

15915390

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrochemical reaction device, comprises: an anode to oxidize a first substance; a first flow path facing on the anode and through which a liquid containing the first substance flows; a cathode to reduce a second substance; a second flow path facing on the cathode and through which a gas containing the second substance flows; a porous separator provided between the anode and the cathode; and a power supply connected to the anode and the cathode. A thickness of the porous separator is 1 μm or more and 500 μm or less. An average fine pore size of the porous separator is larger than 0.008 μm and smaller than 0.45 μm. A porosity of the porous separator is higher than 0.5.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBATOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hongo, Takuya Yokohama, JP 19 74
Kanai, Yuta Fuchu, JP 26 9
Kudo, Yuki Yokohama, JP 161 406
Mikoshiba, Satoshi Yamato, JP 151 825
Ono, Akihiko Kita, JP 136 483
Tamura, Jun Chuo, JP 142 872
Yamagiwa, Masakazu Yokohama, JP 74 232
Yoshinaga, Norihiro Yokohama, JP 58 200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00