Semiconductor-mounting heat dissipation base plate and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10898946
APP PUB NO 20190111467A1
SERIAL NO

16080163

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a semiconductor-mounting heat dissipation base plate including: an insulating substrate to which a metal circuit layer for mounting a semiconductor chip thereon is fixed; a heat dissipation base formed from the same metal material as the metal circuit layer at a side opposite to the metal circuit layer across the insulating substrate and fixed to the insulating substrate similar to the metal circuit layer; and a strengthening member provided in the heat dissipation base so as to be separated from the insulating substrate, the sizes of crystal grains of a metal structure at a part of the heat dissipation base or the metal circuit layer are reduced by a crystal size reducing material adhered to a mold, thereby preventing an adverse effect of a columnar crystal structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishihara, Mikio Tokyo, JP 50 504
Iwasa, Tatsuya Tokyo, JP 50 317
Oya, Daisuke Tokyo, JP 18 90
Saito, Koji Tokyo, JP 248 2235
Tanaka, Keisuke Tokyo, JP 188 1951
Wakabayashi, Yuki Tokyo, JP 54 184

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00