Water processing system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11414960
APP PUB NO 20190137094A1
SERIAL NO

16306731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water processing system (10) comprises a reactor (12) configured to receive a feed water input (FW). The reactor (12) is configured to convert the feed water input (FW) into a steam output (S) for use in a downstream operation. The processing system (10) is configured to utilise the thermal and/or mechanical energy of the feed water input (FW) to partially power the conversion of the feed water input (FW) to the steam output (S). The system (10) further comprises a heat generator arrangement operatively associated with the reactor (12), the heat generator arrangement supplying the remaining thermal energy required to convert the feed water input (FW) into the steam output (S).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOWERS HANK JAMESLONDON W2 5BP

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sowers, Hank James London, GB 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00