Connecting element for producing a connection between a hollow profiled element and a further component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11015628
APP PUB NO 20190178277A1
SERIAL NO

16321066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a connecting element (1) for producing a connection between a hollow profiled element (16) and a further component (17), wherein the connecting element (1) is designed for at least interlockingly engaging with the hollow profiled element (16) and for connecting to the further component (17). According to the invention, at least two contact surfaces (2, 3), which are arranged at an offset to each other in height, are provided on the connecting element (1) for contact with at least two sections (18, 19) of the hollow profiled element (16) that correspond to said contact surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LINDE + WIEMANN SE & CO. KG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Georg, Marcel Dillenburg, DE 4 8
Schmidt, Werner Alzenau, DE 89 1739
Solbach, Michael Wenden, DE 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 25, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00