Vibratory fluidized bed dryer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10955189
APP PUB NO 20190186832A1
SERIAL NO

16223371

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluidized bed dryer may include a deck, an eccentric, and a blower. A heater may or may not be included. The deck of the fluidized bed dryer may vibrate due to motion of the eccentric. The blower may blow air through the deck of the fluidized bed dryer to dry material on the deck. As the material dries, the material moves across the deck, due to the vibration. The deck bed depth may be increased, which may allow for even process air flow distribution and control of conveyance speed and residence time. The fluidized bed dryer may include a controller configured to implement a drying process that may include one or more of temperature, moisture content, and relative humidity data to optimize product throughput while ensuring a desired degree of dryness.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OLIVER MANUFACTURING COMPANY INC27151 HARRIS ROAD LA JUNTA CO 81050

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barnes, Matthew La Junta, US 27 463
Saribal, Okan La Junta, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00