Method for manufacturing a light extraction structure for a UV lamp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10838112
APP PUB NO 20190204476A1
SERIAL NO

16302451

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a light extraction layer including nanostructures, the method including: providing a substrate, the substrate being at least partially transparent to UV light; forming a non-aqueous precursor solution comprising fluorine and an alkaline earth metal to form alkaline earth metal difluoride particles; applying the precursor solution on at least a first side of the substrate; drying the substrate at a first temperature for a first period of time; and baking the substrate at a second temperature, higher than the first temperature, for a second period of time, thereby forming a light extraction nanostructure layer comprising alkaline earth metal difluoride nanostructures on the substrate. Also, a light extraction structure and to a UV lamp including such an extraction structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PUREFIZE TECHNOLOGIES AB754 50 UPPSALA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carlsson, Jan-Otto Uppsala, SE 13 91
Nikonova, Olesya Uppsala, SE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00