Replenishment and order fulfillment system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10633184
APP PUB NO 20190210804A1
SERIAL NO

16358488

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A warehousing system for storing and retrieving goods disposed in containers is provided. The system includes a multilevel storage array including an array of storage shelves for holding containers thereon, at least one substantially continuous lift for transporting containers to and from at least one level of the storage array, at least one transport vehicle located on the at least one level and configured to traverse a transport area transporting containers between the at least one continuous lift and container storage locations so that the at least one continuous lift communicates non-deterministically, via the transport vehicle, with storage locations of each of the storage shelves on the at least one level, an infeed transport system linked to the at least one continuous lift, and an order fulfillment station for generating order containers corresponding to customer orders where the order containers are entered onto the storage shelves of the storage array.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYMBOTIC LLC200 RESEARCH DRIVE WILMINGTON MA 01887

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lert, John Wakefield, US 42 2708

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00