Power generation amount estimation apparatus, distribution grid system, and power generation amount estimation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11151666
APP PUB NO 20190213693A1
SERIAL NO

16302482

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A distribution grid management apparatus that is a power generation amount estimation apparatus includes a communication unit to acquire a solar radiation amount that is a measurement value measured by a solar radiation meter at an interval shorter than a data collection interval that is an interval at which a measurement value from a smart meter that measures the amount of electric power is collected; and a power generation amount calculation unit to estimate, on the basis of the solar radiation amount, the power generation amount of each of a plurality of photovoltaic facilities connected to a distribution line of a high-voltage grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Itaya, Nobuhiko Tokyo, JP 25 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00