Bowden cable assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10794418
APP PUB NO 20190226518A1
SERIAL NO

16254139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Bowden cable end piece that facilitates the connection of a Bowden cable to an operating mechanism is disclosed. The end piece includes an elongated frame having a receptacle configured to receive a sheath of a Bowden cable and guide a core of a Bowden cable. The frame has a barrel guide configured to receive a barrel formed on an end of the core. An attachment member on a first end of the frame provides a holding connection with the operating mechanism in an insertion position and an end position. A mounting spring on a second end of the frame has an abutment region configured to abut a mounting surface on a support structure when the Bowden cable end piece is installed in the end position. The Bowden cable end piece can be, in the installed state, pressably attached by the mounting spring in the end position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BROSE SCHLIESSSYSTEME GMBH & CO KG42369 WUPPERTAL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Faust, Rene Dorsten, DE 5 13
Häger, Ole Wuppertal, DE 3 3
Rothenberg, Florian Wuppertal, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00