Operating a high-frequency driver circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11550174
APP PUB NO 20190243169A1
SERIAL NO

16385495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-frequency (HF) driver circuit for an acousto-optical component includes an HF power amplifier connected to a voltage regulator for supply with a supply voltage and a bias voltage generator connected to an input of the HF power amplifier via a switch. The HF driver circuit can include a measurement device configured to measure a temperature of the HF power amplifier and a compensation device configured to control the bias voltage generator according to the temperature. The bias voltage generator is configured to provide a bias voltage to the HF power amplifier. By switching in the bias voltage, the HF power amplifier can be adjusted to a low quiescent current. By switching off the bias voltage, the HF power amplifier can be very rapidly and effectively blocked. As a result, very rapid switching-on and switching-off times, e.g., in a range of 10 to 50 ns, can be achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TRUMPF SCHWEIZ AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brenndoerfer, Knut Seewis Dorf, CH 4 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00