Control device for electric generator/motor and control method for electric generator/motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10804833
APP PUB NO 20190253012A1
SERIAL NO

16336174

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a control device for an electric generator/motor, which includes an armature winding and a field winding, the control device including: a bridge circuit configured to energize the armature winding; a field circuit configured to energize the field winding; and an energization control unit configured to control the energization of the bridge circuit and the field circuit. The energization control unit is configured to perform, when performing switching between a generation mode and a drive mode in response to an external command to control the electric generator/motor, control on a current supply amount for the field winding, and vector control on a current supply amount for the armature winding so as to compensate for a variation in field current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hisano, Yuya Tokyo, JP 7 16
Nakamura, Ryo Tokyo, JP 81 507
Seki, Tomohiro Tokyo, JP 19 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 13, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00