Electric discharge machining device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11179789
APP PUB NO 20190262922A1
SERIAL NO

16244122

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dirty fluid tank of a machining fluid supply tank has a capacity smaller than a machining tank and is arranged lower than the machining tank. An intermediate tank has a capacity smaller than the dirty fluid tank, selectively communicates with the dirty fluid tank. A clear fluid tank has a capacity smaller than the intermediate tank, is arranged above the dirty fluid tank and the intermediate tank. The sum of capacities of the dirty fluid tank and the intermediate tank is larger than the capacity of the machining tank. A pipe includes a drain pipeline of the machining tank, a first pipeline for purifying the electric discharge machining fluid and sending the electric discharge machining fluid to the clear fluid tank, and a second pipeline for sending the electric discharge machining fluid from the clear fluid tank to the machining tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SODICK CO LTD3-12-1 NAKAMACHIDAI TSUZUKI-KU YOKOHAMA KANAGAWA 224-8522

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Uneda, Ryo Kanagawa, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00