Erosion control and water flow control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10711420
APP PUB NO 20190264407A1
SERIAL NO

16138562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bio-friendly water flow control system can include a portable structure adapted to contain organic waste material. The water flow control system can be configured for deployment outdoors to guide water flow to limit erosion. A portable structure of such a system can include a sheath that is configured to contain waste material within an interior of the sheath. The portable structure may be configured to allow a flow of water into the interior of the sheath. The portable structure may include a waste material that includes processed palm frond particles. The portable structure may be configured to absorb a weight of water at least 50% greater than a dry weight of the portable structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROYAL CANARY LLC18430 BROOKHURST ST STE 202-N FOUNTAIN VALLEY CA 92708

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Parks, James Clifford Thermal, US 7 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 14, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00