Hydroelectric/hydrokinetic turbine and methods for making and using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11174829
APP PUB NO 20190264647A1
SERIAL NO

16403472

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The application relates to unidirectional hydrokinetic turbines having an improved flow acceleration system that uses asymmetrical hydrofoil shapes on some or all of the key components of the turbine. These components that may be hydrofoil shaped include, e.g., the rotor blades (34), the center hub (36), the rotor blade shroud (38), the accelerator shroud (20), annular diffuser(s) (40), the wildlife and debris excluder (10, 18) and the tail rudder (60). The fabrication method designs various components to cooperate in optimizing the extraction of energy, while other components reduce or eliminate turbulence that could negatively affect other component(s).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYDROKINETIC ENERGY CORP

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schurtenberger, Walter Key West, US 7 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00