Angstrom-scale nanowire arrays in zeolite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11195634
APP PUB NO 20190267154A1
SERIAL NO

16287721

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite material of Angstrom-scale nanowire arrays in zeolite and its fabrication methods are provided. The zeolite can be prepared by a hydrothermal method and the Angstrom-scale nanowire arrays can be prepared by using zeolite as a template. The zeolite can have porous structures with an average pore size of 0.74 nm and the plurality of nanowires can have an average diameter smaller than 1 nm and can be dispersed on internal or external surfaces of the porous structures. The Angstrom-scale nanowire arrays can be made of aluminum (Al), gallium (Ga), zinc (Zn), or carbon (C). A composite material of the Angstrom-scale aluminum (Al), gallium (Ga), or zinc (Zn) nanowire arrays in zeolite can exhibit characteristics of one-dimensional (1D) superconductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGYTHUWAL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lai, Zhiping Thuwal, SA 16 74
Sheng, Ping Hong Kong, CN 48 640
Zhang, Bing Hong Kong, CN 221 806

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00