Hidden fastener railing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11180921
APP PUB NO 20190271161A1
SERIAL NO

16049396

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular block toy and kit that includes a male cubic unit piece having a plurality of faces with a male node extending from each respective face of the plurality of faces, and a female piece having a plurality of faces and corners formed by three intersecting faces, the female piece having a female component formed on a respective face of each of the plurality of faces that is sized and shaped to receive a respective male node enabling connection using any side of the female piece and any side of the male piece, and in which all sides of the female and male pieces with the snapping and interlock design are identical, enabling the pieces to be snapped together using any side of the female or male piece to achieve build out indefinitely in any direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EGLASS LLCVANCOUVER WA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Culp, Jeremiah D Vancouver, US 2 7
Reimer, Eric W Camas, US 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00