Flexible construction unit, kit, and method for constructing a structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10717019
APP PUB NO 20190275440A1
SERIAL NO

16296543

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A construction unit may have a main body formed from a flexible material. The main body may have a first side and a second side. The construction unit may have a plurality of magnetic connectors attached to the main body. A kit for construction of a structure may have a plurality of construction units, at least one flexible link, at least one active unit, and at least one control unit. A method of making a structure includes a first step of providing a plurality of construction units. There is second step of connecting at least one of the magnetic connectors of a first one of the construction units with at least one of another one of the magnetic connectors of the first one of the construction units, and at least one of the magnetic connectors of a second one of the construction units, whereby the structure is formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYISH LABS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barlev, Yaron Closter, US 4 10
Eshet, Assaf Brooklyn, US 8 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 21, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 21, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00