Input impedance management and leakage current detection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10910825
APP PUB NO 20190296542A1
SERIAL NO

16357793

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for an electrical power distribution network includes an electrical apparatus configured to monitor or control one or more aspects of the electrical power distribution network, the electrical apparatus including a contact switch configured to open and close. The system also includes an input apparatus. The input apparatus includes an impedance module; and an input interface electrically connected to the impedance module and to the contact switch of the electrical apparatus. The input interface is configured to have one of a plurality of input impedances, the plurality of input impedances include at least a first input impedance and a second input impedance that is lower than the first input impedance, and the input interface has the second input impedance when the contact switch of the electrical apparatus is open. The input apparatus may include a plurality of leakage current detection modules.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITED30 PEMBROKE ROAD DUBLIN 4 D04 Y0C2 D04 Y0C2

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Yousef, Hani Emil Oak Creek, US 1 0
Kromrey, Timothy Mark Milwaukee, US 7 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00