Configuring puncture bundles of data for a first service in a transmission of a second service

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10965402
APP PUB NO 20190296861A1
SERIAL NO

15776953

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmitting node determines data for a first service will be transmitted during a time period when data for a second service will be transmitted. The data for the first service requires lower latency than the data for the second service and the data for the first service includes an original set of data for the first service and at least one repetition of the original set of data for the first service. The transmitting node adjusts resources consumed by the data for the first service based on available transmission resources. During the time period the transmitting node then transmits the data for the first service using the adjusted resources while data for the second service is transmitted during the time period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)-- STOCKHOLM SE 164 83

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ashraf, Shehzad Ali Aachen, DE 98 1879
Blankenship, Yufei Kildeer, US 304 2435
Kilinc, Caner Luleå, SE 28 1581
Zhang, Zhan Beijing, CN 131 2251
Zou, Zhenhua Solna, SE 112 523

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00