Conduction path

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10727655
APP PUB NO 20190305531A1
SERIAL NO

16356492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a technique that improves the heat dissipation properties of a wire that is arranged in a conduction path. A conduction path has a wire, a routing member that is made of a metal and has a routing groove in which the wire is routed, a bracket that is made of a metal and has a first mounting portion that is mounted to the routing member and has a second mounting portion that is mounted to an electrical connection box, and a heat transfer member that is made of a synthetic resin having a higher heat conductivity than air and is arranged in the routing groove and interposed between the wire and the routing member, in a region that corresponds to a portion of the routing member to which the first mounting portion is mounted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO WIRING SYSTEMS LTD1-14 NISHISUEHIRO-CHO MIE YOKKAICHI-SHI 510-8503
SUMITOMO ELECTRIC INDUSTRIES LTDOSAKA-SHI OSAKA 541-0041
AUTONETWORKS TECHNOLOGIES LTD1-14 NISHISUEHIRO-CHO MIE YOKKAICHI-SHI 510-8503

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimura, Yuki Mie, JP 36 176
Okamoto, Ryoya Mie, JP 35 239
Shimizu, Hiroshi Mie, JP 514 5554

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 28, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00