Cleaning liquid supplying system, substrate processing apparatus and substrate processing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11090692
APP PUB NO 20190308223A1
SERIAL NO

16373004

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, provided is a cleaning liquid supplying system including: a circulation line in which cleaning liquid flows, first end of the circulation line being connected to a supply port of a cleaning liquid supplying apparatus, second end of the circulation line being connected to a collection port of the cleaning liquid supplying apparatus; a branch pipe branched from the circulation line and connected to a substrate cleaning unit; a valve provided on the branch pipe and configured to control supply of cleaning liquid from the circulation line to the substrate cleaning unit; and a flow rate adjuster configured to adjust a flow rate of the cleaning liquid flowing in the circulation line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EBARA CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imamura, Akira Tokyo, JP 85 726
Inoue, Takuya Tokyo, JP 142 861
Miyazaki, Mitsuru Tokyo, JP 78 433
Takahashi, Shozo Tokyo, JP 3 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00