Learning power grid characteristics to anticipate load

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10628762
APP PUB NO 20190311442A1
SERIAL NO

15948750

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Improving the operations of a data center that is located within a power grid and that includes its own power sources. Past operational characteristics of the power grid are analyzed to derive learned characteristics for the power grid. Current and/or future operational characteristics of the power grid are also monitored. A prediction regarding an upcoming, anticipated load for the power grid is then generated using the learned characteristics and the monitored characteristics. In response to this prediction, one or more mitigation operations are selected and then performed at the data center to ensure that the data center is adequately available. Some of these mitigation operations include, but are not limited to, causing the data center to consume more power, causing the data center's power sources to store more power, or causing the data center to migrate services and/or data to a different data center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICROSOFT TECHNOLOGY LICENSING, LLC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blas, Vincent Joseph Edmonds, US 3 5
Helsel, Michael Rees Seattle, US 9 12
James, Sean Michael Olympia, US 22 39
Keehn, Nicholas Andrew Kirkland, US 38 54
Middaugh, Brandon Redmond, US 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00