Power tower

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11009002
APP PUB NO 20190316563A1
SERIAL NO

16465659

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A renewable-energy power plant including a first structure, a second structure, a first flue, a second flue and a turbine arrangement comprising at least one turbine, wherein the first structure includes a primary fluid inlet and the second structure includes a secondary fluid inlet and a primary fluid outlet, wherein the secondary fluid inlet is connected to the first flue, wherein the primary fluid inlet is located lower than the secondary fluid inlet and the primary fluid outlet is located lower than the secondary fluid inlet, wherein the turbine arrangement is provided inside the second flue, wherein the power plant includes wetting means arranged to discharge an additive fluid to the working fluid passing through the secondary fluid inlet, wherein the turbine arrangement is arranged to generate power due to the working fluid flowing in a downwards direction inside the second flue and passing through the turbine arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hyseni, Kujtim Halmstad, SE 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00