Condenser and steam turbine plant provided with same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10760452
APP PUB NO 20190331005A1
SERIAL NO

15999818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A condenser includes heat transfer pipe groups, a main body and an intermediate body. The intermediate body has an inlet that opens in a horizontal direction, and an outlet that opens downward. The main body has an inlet that opens upward and is connected to the intermediate body outlet. The heat transfer pipe groups are arranged in the horizontal direction and disposed in the main body. A near-side outlet edge is an edge of the intermediate body outlet on a side near the intermediate body inlet in the horizontal direction and a far-side outlet edge is an edge of the intermediate body outlet on a side far from the intermediate body inlet. At least one part of the main body is located below an imaginary line that connects the near-side and far-side outlet edges and at least one part of the main body is located above the imaginary line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTDYOKOHAMA KANAGAWA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hotta, Katsuhiro Yokohama, JP 9 17
Nakamura, Taichi Yokohama, JP 88 222

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00