Binary power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10830217
APP PUB NO 20190331097A1
SERIAL NO

16506785

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a high-temperature-side loop to which thermal fluid from a thermal line is supplied for power generation, a low-temperature-side loop to which the thermal fluid from the high-temperature-side loop is guided for power generation, a thermal-fluid thermometer to detect a temperature of the thermal fluid supplied to the high-temperature-side loop, and a line switcher to switch, on the basis of the detected temperature of the thermal-fluid thermometer, between a mode where the thermal fluid from the thermal line is supplied through the high-temperature-side loop to the low-temperature-side loop and a mode where the supply of the thermal fluid to the high-temperature-side loop is shut off and the thermal fluid is supplied only to the low-temperature-side loop.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IHI CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naito, Toshiyuki Koto-ku, JP 21 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 10, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00