Systems and methods for predicting tube fouling in a fired apparatus, and for utilizing tube fouling predictions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11668536
APP PUB NO 20190331336A1
SERIAL NO

16358426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The following provides a system and method to predict an indicator of tube fouling in a fired apparatus such as a boiler. Historical data can be collected when the tubing is still considered to be clean, and used to build a first model between an indicator of fouling, such as tube skin temperature, and boiler load. The actual measurement of that indicator of fouling can then be compared against the model output, such that the error between the model and measurement is considered an indication of the tube fouling. Moreover, the rate of change of the model error can be used to measure the fouling rate. Next, historical data on the fluid feed quality can be collected and together with the historical error rate change data can be combined to develop a second model. This second model reflects how fluid feed quality variables may affect the fouling rate over time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUNCOR ENERGY INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Qi, Fei Calgary, CA 34 86
Walker, Mathew Calgary, CA 8 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00