Method for manufacturing tow prepreg

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10933441
APP PUB NO 20190337011A1
SERIAL NO

16518784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tow prepreg manufacturing apparatus applies resin to an original tow of reinforcing fibers. The tow prepreg manufacturing apparatus includes an oiling roller, a scraper, a resin reservoir, a tube pump, and a controller. The oiling roller is supplied with resin while rotating at a predetermined rotation speed. The scraper adjusts the shape of the resin supplied onto the oiling roller. The resin reservoir supplies resin to the oiling roller. The tube pump discharges resin to the resin reservoir. The controller controls the tube pump so that the amount of resin held in the resin reservoir remains constant and controls the rotation speed of the oiling roller so that a resin content of a wound tow prepreg becomes equal to a target resin content.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MIZUNO CORPORATION; MIZUNO TECHNICS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwata, Mototaka Osaka, JP 18 584
Utsumi, Akiyoshi Gifu-ken, JP 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 2, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00