1T-phase transition metal dichalcogenide nanosheets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10961127
APP PUB NO 20190352190A1
SERIAL NO

16478990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the production of 1T-transition metal dichalcogenide few-layer nanosheets and/or monolayer nanosheets comprising electrochemical intercalation of lithium ions into a negative electrode comprising a bulk 2H-transition metal dichalcogenide to provide an intercalated electrode, and an exfoliation step comprising contacting the intercalated electrode with a protic solvent to produce 1T-transition metal dichalcogenide few-layer nanosheets and/or monolayer nanosheets. An electrochemical capacitor comprising a composite electrode comprising 1T-MoS2 nanosheets and graphene, and a method of producing a composite electrode for use in an electrochemical capacitor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE UNIVERSITY OF MANCHESTER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dryfe, Robert Manchester, GB 7 12
Ejigu, Andinet Manchester, GB 3 5
Kinloch, Ian Manchester, GB 15 162

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 30, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00