Control apparatus for a synchronous motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10931213
APP PUB NO 20190356248A1
SERIAL NO

16528129

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drive control unit that performs vector control of a synchronous motor determines reference phase angles of 3-phase/DQ converters, and a DQ/3-phase converter. When speed of a synchronous motor is equal to or higher than a predetermined threshold value, the reference phase angle is obtained by adding a correction angle such that D-axis voltage feedback output from 3-phase/DQ converter becomes zero to the detection angle of a position detector. And when the speed of the synchronous motor is less than a predetermined threshold value, the reference phase angle is obtained by adding a low speed load angle set in advance to the detection angle of the position detector. In a vector control operation, a power factor is achieved by controlling the D-axis current to be zero.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TMEIC CORPORATIONTOKYO 104-0031

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Masashi Tokyo, JP 225 2340
Watanabe, Fumio Tokyo, JP 102 1872

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00