Dynamic produced water treatment apparatus and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11492278
APP PUB NO 20200102234A1
SERIAL NO

16701210

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automated produced water treatment system that injects ozone or an ozone-oxygen mixture upstream of produced water separators, with the dose rate changing dynamically as the produced water quality changes, as determined by continuous monitoring of the produced water quality by a plurality of sensors that detect water quality parameters in real time. The system may operate as a “slipstream” injection system, that draws a portion of produced water from the produced water pipeline and injects ozone or an ozone-oxygen mixture back into the pipeline with disrupting or slowing normal operations. Disinfectants or other additives may also be injected. The treatment system may be wholly or partially contained in mobile containers or trailers, for on-the-fly use in existing produced water treatment facilities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYDROZONIX LLC333 NORTH RIVERSHIRE DRIVE SUITE 270 CONROE TX 77304

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patton, Mark Conroe, US 31 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00