Board-to-board connector assembly for add-in cards

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10903594
APP PUB NO 20200106201A1
SERIAL NO

16516413

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A board-to-board connector assembly includes a connector interposer between first and second connectors each having a connector housing holding contacts and having a card slot for interfacing with a circuit card edge of a corresponding add-in card. The connector housings have board guides configured to engage the add-in cards and guide mating therewith. The connectors have latches configured to latchably engage the add-in cards to secure the connector to the add-in cards. The connector interposer electrically interconnects the first contacts and the second contacts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TE CONNECTIVITY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Behziz, Arash Newbury Park, US 30 487
Herring, Michael David Apex, US 54 541
Schmitt, Matthew Ryan Middletown, US 18 239

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 26, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00