Gasification reactor with pipe distributor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10696913
APP PUB NO 20200140768A1
SERIAL NO

16723538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A large-scale fluidized bed biogasifier provided for gasifying biosolids. The biogasifier includes a reactor vessel with a pipe distributor and at least two fuel feed inlets for feeding biosolids into the reactor vessel at a desired fuel feed rate of more than 40 tons per day with an average of about 100 tons per day during steady-state operation of the biogasifier. A fluidized bed in the base of the reactor vessel has a cross-sectional area that is proportional to at least the targeted fuel feed rate such that the superficial velocity of gas is in the range of 0.1 m/s (0.33 ft/s) to 3 m/s (9.84 ft/s). In operation, biosolids are heated inside the fluidized bed reactor to a temperature range between 900° F. (482.2° C.) and 1600° F. (871.1° C.).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARIES GASIFICATION LLC3026 OWEN DRIVE SUITE 101 NASHVILLE TN 37013

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bull, Douglas R Vancouver, CA 5 33
Cairney, Paul Deltona, US 5 33
Cox, Gerald M Cocoa, US 17 834
Davis, Brandon Murfreesboro, US 50 642
Jepson, William P Orlando, US 10 167
Kelfkens, Renus Longmont, US 12 24
Patten, Ross Palm Coast, US 1 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00