Method and system for converting wind energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11415102
APP PUB NO 20200158082A1
SERIAL NO

16496599

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to the field of energy, in particular to devices converting wind energy into electricity. The wind energy conversion method into electrical energy consisting in that the wind energy is converted by means of receivers mounted on the casing of moving wind energy conversion modules, moving linearly along the guide belt, into movement energy of wind energy conversion modules and electric energy by means of electrical energy generating device, mounted on the casing. Wherein there is performing continuous control, depending on the external conditions of the total area of all wind energy receivers guided to the guide belt. In particular embodiments, there is performing continuous control, depending on the external conditions of setting angles of the wind energy receivers relative to the wind energy conversion modules, the movement speeds of the wind energy conversion modules, the aerodynamic profile, and the area of each wind energy receiver, for which it is preferable to use wings with a composite aerodynamic profile, including the main profile, and at least one tilt flap. Also the system for the method embodiment is claimed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILA PRIRODI LIMITED LIABILITY COMPANY (SILA PRIRODI LLC)MOSKOVSKAYA STREET (LVIV MICRODISTRICT) BUILDING 29A ROOMS 8 15 46-50 PODOLSK MOSCOW REGION 142155

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yakimchuk, Vyacheslav Antonovich Moscow, RU 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00