Apparatus and method for a burner assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11585528
APP PUB NO 20200191381A1
SERIAL NO

16715372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner assembly having a blower housing, a blower to supply air to the burner assembly, a blast tube having a longitudinal axis, a fuel source to supply fuel to the burner assembly, a center tube that is substantially parallel to the longitudinal axis and conveys air and fuel to a center tube burner end opening, a plurality of premix tubes, each of which is substantially parallel to the longitudinal axis and conveys air and fuel to a premix tube burner end opening, a diffuser that is disposed in the center tube near the center tube burner end opening, a nozzle that is disposed in the center tube substantially perpendicular to the diffuser. The center tube air and fuel mixture is fuel rich and the premix tubes air and fuel mixture is fuel lean. A method for burning the center tube air and fuel mixture and the premix tubes mixtures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWER FLAME INCORPORATED1725 SHEPHERD ROAD CHATTANOOGA TN 37421

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
George, Kenneth Ray Parsons, US 2 14
Martinie, Michael Ryan McCune, US 1 0
Purdon, Michael Joseph Coffeyville, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 21, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00