Methods and processing unit for electric discharge machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11465223
APP PUB NO 20200198038A1
SERIAL NO

16720777

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preprocessing data related to a tool electrode, which is applied in an EDM machine to manufacture a part comprises: generating an electrode model for the tool electrode based on the geometry of the part; generating the cavity shape model (volume of the part to erode), combining the electrode and cavity shape model, dividing the resulting model into a plurality of slices in a plurality of parallel planes, wherein at least one slice is composed of at least two sections, which are topologically disconnected; and generating for each slice a slice-geometry data, and generating an electrode-geometry data including the slice-geometry data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGIE CHARMILLES SA6616 LOSONE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akten, Olçay Renens, CH 1 0
Chapatte, Christian Peti Lancy, CH 3 2
Perez, Roberto Geneva, CH 12 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00