Internal combustion engine control device and control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10961964
APP PUB NO 20200224623A1
SERIAL NO

16631958

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-injection process includes performing intake synchronized injection in which fuel is injected in synchronism with an open valve period of an intake valve, and an intake asynchronous injection in which fuel is injected at a more advanced timing than during intake synchronized injection. A single-injection process includes injecting a required injection amount of fuel by intake asynchronous injection. An operating process includes operating a port injection valve for injecting fuel into an intake passageway. A selection process includes selecting the single-injection process if the temperature of an intake system of an internal combustion engine is not lower than a prescribed temperature, and selecting the multi-injection process if the temperature of the intake system is less than the prescribed temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fuse, Yasufumi Anjo, JP 1 2
Toya, Masanori Toyota, JP 14 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00