Mill bit for the manufacture of a wind turbine blade and method of forming same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11926005
APP PUB NO 20200246923A1
SERIAL NO

16636110

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mill bit for the manufacture of a wind turbine blade includes an elongate based body having a proximal end, a distal end, an outer surface, and an internal bore that defines an inner surface, one or more flutes formed on the outer surface that defines one or more teeth, and an abrasive coating on at least a portion of the outer surface, wherein the one or more flutes are free of the abrasive coating. An abrasive coating may be selectively applied on the inner surface to provide flutes on the inner surface. Additionally, porting bores may be provided through the mill bit to fluidly connect the outside and inside of the mill bit. A method of making a mill bit is also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VESTAS WIND SYSTEMS A/SAARHUS AARHUS REGION MIDTJYLLAND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haight, Jeremy Arvada, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00