Coated sand, production method for same, and production method for casting mold

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11400512
APP PUB NO 20200306822A1
SERIAL NO

16893710

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are: a coated sand having improved fluidity and being capable of improving a filling rate of a casting mold to be obtained; and a coated sand for advantageously manufacturing a casting mold having excellent strength, which coated sand provides a casting mold with good mold-releasability and collapsibility, gives cast products a favorable casting surface, and effectively improves sand adhesion on cast products. The coated sand is formed as a dry granular material having fluidity at room temperature, in which the surface of a refractory aggregate is coated with a solid layer of a water-soluble inorganic binder, and spherical particles of silicone resin having binder-repellency exist on the surface of the binder layer, or form a layer on the surface of the binder layer, a part of the spherical particles being not covered with the water-soluble inorganic binder and being exposed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASAHI YUKIZAI CORPORATIONNOBEOKA-SHI MIYAZAKI 882-8688

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takama, Tomohiro Niwa-Gun, JP 5 1
Ura, Tetsuya Niwa-Gun, JP 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00