Dual-shaft shredder having a quick-change device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11192115
APP PUB NO 20200316609A1
SERIAL NO

16304202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shredding device is provided comprising two shredding shafts arranged parallel to each other with shredding elements arranged thereon, wherein the shredding shafts are preferably rotatable mechanically synchronized to each other. A shaft-side coupling element is connected to a respective first end of the shredding shafts. The shredding device includes a housing with a housing-side coupling element is provided that can be coupled to the shaft-side coupling element. The shredding device includes a displacement device enabling displacement of the shredding shafts for decoupling and coupling the shaft-side coupling element from or to the housing-side coupling element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MANUEL LINDNERVILLACHER STRASSE 48 SPITTAL/DRAU 9800

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fritz, Mario Millstatt, AT 9 93
Lindner, Manuel Spittal/Drau, AT 11 18
Schiffer, Peter Millstatt, AT 14 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00