Child booster seat assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11141000
APP PUB NO 20200352350A1
SERIAL NO

16869602

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A child booster seat assembly includes a base seat and an upper seat. A first seating area is formed on the base seat. The upper seat is detachably installed on the base seat. The upper seat can be installed on the base seat installed on an adult chair at a higher position or detached from the base seat and installed on the adult chair at a lower position, which allows a caregiver to adjust an elevated height of the upper seat easily. Furthermore, when the upper seat is detached from the base seat, the upper seat and the base seat can be used independently and respectively installed on two adult chairs for accommodating two children at once.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WONDERLAND SWITZERLAND AG6312 STEINHAUSEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huntley, John E Philadelphia, US 19 19
Ingraham, Jerry S Denver, US 8 35
Mountz, Jonathan K Birdsboro, US 49 380
Saint, Nathanael Morgantown, US 51 651

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00