Vehicle cooling system and wire harness cooling structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11440491
APP PUB NO 20200353791A1
SERIAL NO

16840294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle cooling system includes a wire harness WH electrically connected to a plurality of heat-exchange target electric devices, a J/B electrically connected to the wire harness and a high-voltage battery, electric device medium pipes routed along a routing path of the wire harness and used for circulation of a heat exchange medium through the heat-exchange target electric devices, and a path switching unit connected to the electric device medium pipes so that the heat exchange medium can be circulated, and configured to form a heat exchange medium path in which the heat exchange medium is circulated through the plurality of heat-exchange target electric devices. The path switching unit is provided in the J/B and forms the heat exchange medium path according to a heat generation state of the heat-exchange target electric devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakabe, Takashi Shizuoka, JP 6 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00