Machining device for duplex gear of high-precision reducer for robot, and use method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11478867
APP PUB NO 20200376576A1
SERIAL NO

16889539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machining device for duplex gear of high-precision reducer for robot includes a laser welding device, a laser rotary support, a rotary mechanism and a rotary platform, the rotary mechanism being installed with a reducer body, wherein a center of a central gear is fixedly connected with a rotating shaft; sets of duplex gears are evenly disposed around the central gear; the gear of each set of duplex gear which is connected with the central gear are connected to an output gear ring from outside; a fixed gear ring is disposed above the output gear ring; a rotating frame is disposed at ends, close to the top of the reducer, of rotating shafts of the sets of duplex gears and the rotating shaft of the central gear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEIJING INSTITUTE OF TECHNOLOGY100000 NO 5 SOUTH MAIN STREET HAIDIAN DISTRICT BEIJING ZHONGGUANCUN BEIJING CITY BEIJING CITY 100000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Xuxiao Beijing, CN 3 2
Huang, Qiang Beijing, CN 254 2730
Huang, Richeng Beijing, CN 5 3
Meng, Fei Beijing, CN 21 129
Tang, Chenglong Beijing, CN 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00