Segregated steam system and process in a hydrogen production facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11391457
APP PUB NO 20210033275A1
SERIAL NO

16529854

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A segregated steam system and process in a hydrogen production facility wherein boiler feed water is heated by indirect heat exchange with a reformate, the heated boiler feed water is used to heat water condensate formed from the reformate, the heated water condensate is passed to a first steam drum for producing steam for a reformer feed gas mixture, and a second portion of the heated boiler feed water is passed to a second steam drum for producing steam for export.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIR PRODUCTS AND CHEMICALS INC1940 AIR PRODUCTS BOULEVARD PATENT DEPT ALLENTOWN PA 18106-5500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Peng, Xiang-Dong Lake Mary, US 39 340

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00