Dry to wet abrasive blast machine conversion kit and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11565372
APP PUB NO 20210046608A1
SERIAL NO

17071521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dry to wet abrasive blast machine conversion kit and method usable to convert an existing blast pot configured for sand blasting for use in wet abrasive air blasting includes a multi-function fluid manifold, and a control panel attachable to the blast pot to effectuate a first hydraulic circuit, a second hydraulic circuit, and a pneumatic circuit. The dry to wet abrasive blast machine conversion kit installs to the existing blast pot as is, and therefore enables conversion for wet abrasive blasting without additional penetrations through the blast pot envelope which might otherwise compromise manufacturer warranty and use ratings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JTB HOLDINGS LLC1100 W LITTLETON BLVD STE 440 LITTLETON CO 80120

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fenley,, Jr Jerry L Gonzales, US 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 31, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 31, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00