High pressure pumping system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11493035
APP PUB NO 20210048023A1
SERIAL NO

16993907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump technology that provides for more effective and efficient transfer of liquids, such as petroleum products and components, to and through pipelines. Such a technology can comprise a type of external gear pump that creates higher flow, resulting in higher pressures in the pipeline, to move the liquids, while providing for longer pump life, simpler and less maintenance, and fewer undesired conditions, with a smaller footprint, in a cost-effective system. Further, one or more portions of the pump can be configured to be easily replaceable to provide for maintenance in place, and provide for longer pump life. Additionally, one or more portions of the pump can be constructed with or coated with abrasive resistant material that extends the life of the external gear pump. Such material can also reduce the friction between surfaces and improve the life of the external gear pump under poor feeding conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VIKING PUMP INC406 STATE STREET CEDAR FALLS IA 50613

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Andrew Waterloo, US 33 220
Crawford, Michael R Cedar Falls, US 8 67
Gerbig, Josh Cedar Falls, US 1 2
Meyer, Scott Brandon, US 69 1941
Neff, Cameron Waterloo, US 2 3
Pierce, Justin Dunkerton, US 11 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00