Metal porous material, fuel cell, and method of producing metal porous material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11434547
APP PUB NO 20210062300A1
SERIAL NO

16637797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal porous material according to an aspect of the present disclosure is a metal porous material in sheet form that includes a frame having a three-dimensional network configuration, wherein the frame includes an alloy including at least nickel (Ni) and chromium (Cr), the frame 11 is a solid solution with iron (Fe), the frame includes a chromium oxide (Cr2O3) layer as an outermost layer and includes a chromium carbide layer located under the chromium oxide layer, the chromium oxide layer has a thickness not less than 0.1 μm and not more than 3 μm, and the chromium carbide layer has a thickness not less than 0.1 μm and not more than 1 μm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO ELECTRIC TOYAMA CO LTDIMIZU-SHI TOYAMA 934-8522

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mabuchi, Seiji Imizu, JP 6 1
Nishimura, Junichi Imizu, JP 102 398
Tsuchida, Hitoshi Imizu, JP 41 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00