Adjustable hockey runner assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11420106
APP PUB NO 20210086057A1
SERIAL NO

16581133

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-degree of freedom ice skate post that connects an ice skate blade to the sole of an ice-skating boot generally comprises a plurality of adjustable elements that include a pronate/supinate platform, a bi-directional module and a side/side module. In some configurations, the pronate/supinate platform is configured to move the ice skate blade in a pronate and supinate direction. In some configurations the pronate supinate platform is connected with the bi-directional module providing movement of the ice skate blade in the fore and aft position. In some configurations the side/side module is connected with the bi-directional module providing movement in a side by side direction. Additional configurations can include vertical adjustments as well.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTSHULER EDWARD LDACONO CO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Altshuler, Edward L Dacono, US 10 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00