Systems and methods of battery management and control for a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11745616
APP PUB NO 20210086652A1
SERIAL NO

17247339

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, apparatuses, and methods disclosed herein include managing, by a controller, a state of charge of a battery of a hybrid vehicle at a particular location at a particular time based on a determined potential propulsion power for the vehicle; responsive to determining a downhill grade at the particular location, determining, by the controller, an amount of braking energy available during traversal of the downhill grade; and discharging, by the controller, the battery to direct energy to at least one of a generator or an electrified accessory of the hybrid vehicle before the downhill grade to enable reception of at least a portion of the determined amount of braking energy available.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS INC500 JACKSON STREET COLUMBUS IN 47201

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Follen, Kenneth M Greenwood, US 45 205
Gopal, Arun Prakash Thunga Columbus, US 15 108
Sane, Mugdha S Columbus, US 12 81
Sujan, Vivek A Columbus, US 87 1050
Tulpule, Pinak Jayant Columbus, US 18 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00